Sunday, 25 November 2012

Another Finish from the Christmas List

One of the teachers at school is leaving on maternity leave.  I had it in my head that it was at the end of term, so I have an I-Spy quilt on the list, but no rush . . .  Until I was told that she leaves at the end of this month!

Gulp.  Luckily I did have the blocks cut and stitched into strips, so a quick quilt as I go (my method which really is quick!) and add a binding, and it's now done

Panic over



The To Be Done By Christmas list now looks like . . .
  • Nicky's Book Block (Out of Africa) 
  • Janine's Butterfly block (Out of Africa)
  • I-Spy for Liz
  • I-Spy for Jane (Chloe)
  • Christmas sack for Chloe
  • Christmas sack for Richard
  • Christmas sacks for Liam and Harry
  • 12 place mats for Carol
  • 2 Pairs of Patchwork boots
  • Warm Stars quilt for Philippa
  • Christmas Tree by Candlelight wall hanging
  • Napkins for Anna
  • Batik Square Dance 
  • I-Spy for Dina
  • Christmas Waistcoat

10 comments:

  1. Well done on your quilty finish! That's quite a list of things to do, though isn't it? Only one month to go to the big day..... and by my count, 26 items to make. So long as you manage one a day you'll be done in plenty of time! no pressure, then!

    xx

    ReplyDelete
  2. OMG is it Christmas? Better get on home and deal with it then!

    ReplyDelete
  3. That was a fast turnaround! That's an impressive list of projects you have too.

    ReplyDelete
  4. That sure was a quick, and lovely quilt Benta! Your list is longer than mine, although we have 2 of the same ones! :-)

    ReplyDelete
  5. My block can wait till after Christmas Benta - can't see me getting anything done on them before!

    ReplyDelete
  6. Your Christmas to do list is insane! Crazy lady, I bet you get them all done though. That I-Spy quilt is lovely though :)

    ReplyDelete
  7. Well done on the finish and only 26 more to go!

    ReplyDelete

Thanks for your comment. I will always acknowledge a comment if I am able to contact you