Showing posts with label A to Z project. Show all posts
Showing posts with label A to Z project. Show all posts

Wednesday, 18 July 2012

Papers, and Pay it Forward, and a Pillow

The Papers have been out in strength to visit and photograph the A to Z Wall hanging:

This is from the Windsor and Eton Express

Pupils' iconic Windsor images to be displayed at castle

Schoolchildren and their families racked their brains to come up with iconic images of Windsor.
The children from Trinity St Stephen School in Vansittart Road teamed with their families in special 'after school' sessions to create the images in felt on a fabric background.
Luckily, 26 families came forward - one icon for each letter of the alphabet.
The resulting 6ft by 5ft creation is topped off by the school logo, knitted by headteacher Dalwyn Attwell.
You can see it at nearby St Stephen's Church until Monday.
Over the next month it will also be displayed at the Firestation in St Leonard's Road, Holy Trinity Church in Claremont Road, Windsor Library on Bachelors Acre, the museum at the Guildhall, and - to pupils' delight - the Education Centre at Windsor Castle from August 27 to September 2.
It returns to the school next term.

The Pay It Forward is this star:

A lovely lady, Marguerite, was part of a quilting bee: she had managed to keep up with all the blocks she was to send to the other members, but didn't have time to plan or cut the fabric for her own blocks.  The Bee Mama arranged to have others send her star blocks, but not enough for a quilt top.  I read about Marguerire on Hadley's blog, and having been recently the recipient of quilter's generosity, felt I should do something to Pay It Forward


 And the Pillow: this embroidery for a customer


Saturday, 14 July 2012

An Unveiling and an Unshackling

We had a great assembly yesterday, with the head giving a fantastic talk about all the talents that are evident in the school (the previous night had been the school production, so he started with singing, dancing and acting, leading into drawing and sewing)
 

And then he unveiled the Wall Hanging

 There is a clear shower curtain in front of it to keep it clean, but it muted the colours in the photos more than I expected.  I will get a better photo on Monday.

This is me, and Claire, the mum who helped lead the classes, and who has arranged the parish tour for the quilt - two churches will show it for a week each, as will the crafts centre, the museum and the library, and the Moat House - at Windsor Castle!!!!!!!!!

So, released (unshackled) from the pressure of the Wall Hanging, I have today managed to finish the Purple Present.  Well to be fair, it's only *almost* finished - I still have to hand stitch the binding, but that's just an hour in front of the TV so that doesn't really count!

Wednesday, 11 July 2012

The Taming of the Beast

The fixing has now been finished (who would have thought it so difficult to get red drawing pins)


and the wall hanging is going to school tomorrow so Claire and I can sew the binding . . .


Then

It

Is

FINISHED!

Tuesday, 10 July 2012

Wet in Windsor

The Olympic Flame came to Windsor, and started at the top of the school's road, so I wondered out to see it, about 5 minutes before it was due to set off.

A minute later it went past, but before I was really aware of what was happening.  Two minutes later the heavens opened - I just made it back to school without getting drenches, I felt so sorry for those who were further along the route!


I was there, I did see the flame, and  I did take photos, but managed to miss the flame!

I came home and spent the evening sorting the hanging system for the A to Z project, with lots of help from husband.  It had been stapled to a wooden pole, and hooks screwed into the top of the pole.
Fed up with it now, off to bed, night night!

Monday, 9 July 2012

The Beast is (almost) bound


The A to Z wall hanging is now assembled, and the the binding is half attached on 3 sides.  It's too heavy for the plan of Velcro tabs so I'm rethinking the top.  Friday is getting scarily close!
Published with Blogger-droid v2.0.6

Saturday, 7 July 2012

Friday, 6 July 2012

Basting The Beast (with help from Bodger Brian)

We don't call husband Bodger Brian for nothing . . .

This is part of my work/sewing bench.  It is wider than this, but here you can see the depth, and the sewing machine is about the size of the small quilt you can see, which doesn't leave much space for the stitched fabric.

And The Beast (AKA The A to Z project) needs space - it's huge, heavy and not too flexible.
PLAN A -I decided I would like a Sew Ezi table - too long to wait .
PLAN B - I set up my ironing board in front of the bench - too much wobble
PLAN C - Brian found two unused folding stools from a  previous kitchen which included a breakfast bar, and a plank of wood which will become cupboard doors in a future kitchen . . .



And now I have my own sewing table extension :-)

(As this saved nearly two hundred pounds, I can spend that money on something else, right?)


Which is very handy when sewing something as big as the Beast


(OK, not strictly basting, but I'm using my QAYG method which does away with proper basting, and I liked the alteration :-)

Sunday, 24 June 2012

A to Z Update

As mentioned earlier today . . . I didn't get a picture, but the lovely Claire who has been helping every step of the way DID get a photo :-)


Doesn't it look fab!  I cant believe how different each block is

Fete, Flannels, and Fancy That!

We had our school fete yesterday, and I pinned all the finished-so-far A to Z blocks on a big notice board, and they looked FAB!  But you'll have to take my word for it as I forgot to take a photo :-(

I can show you a mosaic but even that's not complete as A, R and W all arrived at school yesterday, but you can see it's getting there (shame mosaic maker cuts off part of the image, they are all complete, honest!)

I took my Baby Brother embroidery machine along, and mum and I sat in the sometime sunshine, me embroidering names on flannels and her tying off the loose ends on the Ladders Quilt that . . .  wait for it . . . someone bought! Fancy That!

(Thanks mum, terrific job done there!)

After a few hours of occasional threats, it did actually start to rain, so mum and I packed the embroidery machine away with a few unfinished orders, so I thought I'd show them here.  And for all who are (quite justly) concerned about my ability to put the right name on the right item, I *think* I have then right this time!




 I just need to trim the jump stitches, and then these flannels can go into school tomorrow

 Do look at all the lovely coloured flannels mum and I got

Rainbow heaven :-)

Thursday, 21 June 2012

Flipping Fonts

Thanks to all who commented on the font change - that wasn't what I chose!    My original font started loading on my ipad as a fancy script, so I changed it all to an ordinary font, but it looks as if Google then changed it to impact - which IS difficult to read.

So now it's just Arial, boring, but very readable!

After showing pictures of the first half of the A to Z sashing I also changed my mind about the layout, so I've now redone them so that each text block is the same width: makes it a bit tidier



Tuesday, 19 June 2012

Friends and Fabric

Jackie, my quilting twin, came over from Ireland for a 48 hour flying visit at the weekend.  I put her to work at the village fair on Saturday (we were an ace Gazebo erecting team, although not such a hot chasing-a-flying-gazebo-across-the-cricket-green team!) and then went on a fabric shop trawl on Sunday.

I was obviously traumatised by not having enough red to finish my Somerset Star, and then I was lead astray by Jackie (it's all her fault) and the circumstances weren't helped by us finding ourselves at Creative Quilting in Hampton Court

So I, um, cough, sheepish look, bought even more fabric!!!!!!

However - it is kind of justified as I have just had another request for an I Spy quilt, and these are all I Spy fabrics

This evening I have been working on the sashing for the Windsor A to Z project: Designing the text on the computer, and then stitching in onto the sashing fabric . . .


And more . . .

Who can guess what I need to be doing tomorrow night!

Wednesday, 6 June 2012

Holiday Happenings (part 1)

We've had the May half term break in England this week, which is all very bizarre as it was in June, not May, and we longer have three school terms (where this break would be half way through term 3, hence its name of half term holidays) but we now have 6 terms, so this is just a break between terms 5 and 6 - go figure, answers on a postcard please!

Anyway, whatever we call it, and whenever it is, I have managed some sewing, in amongst everything else I've tried to squeeze in!

This I spy quilt has been made for baby Amelie, and I'm trying to get her name embroidered before I go and see Grandma this afternoon



These two 'Endless Ribbon' quilts have been finished for the Siblings Together Charity, and need a final 'haircut' before being sent off




This has been finished for Laura's 18th . . .


and I actually remembered to add a label too

Apart from that I have taught the final Windsor A to Z class (these are the blocks that have either been finished, or were snapped under construction)

Had a lovely (albeit wet) day with Lisa in London (!)

and I have thoroughly enjoyed all the pomp and ceremony that celebrated the Diamond Jubilee.

To follow: a felting day with Jacqui and Sarah, a kid's activity afternoon at Chertsey Museum, creating junk weaving wall art, Crafty Church afternoon, socialising with two groups of friends, and a day with mum . . . followed by going back to work for a rest!!!

Monday, 28 May 2012

A to Z broject, penultimate session

As usual, the photos are on the FunWithFabric blog, but I'm posting a mosaic of the latest creations here

Aren't they fab!

Thursday, 17 May 2012

Monday makings and Windsor Wednesdays

Busy week, this one:  Lessons on Monday and Wednesday, and Friday and Saturday!  If they all go as smoothly as the first two I'll be delighted.

As usual the pictures are available in more details, with some words, on the Fun With Fabric blog, they they are just for me to show off what I can inspire people to create (LOL, or what they can do perfectly well without my help!) . . .


Monday at Broom Farm

And Wednesday in Windsor with the A to Z project (not a very catchy name, but it is what it says on the tin)


If you go to the other blog, have a really good look at the stitching on the J block.  I'm not sure if N is 7 or 8, but fantastically neat stitches.

There is a website where we can make a kind of mosaic, but it's like a design wall, so you can put pics of blocks as they've been made, to get an idea how the whole patchwork will look - does anyone have any idea of it's name?  I'm thinking blue frog, or green cow, something like that?  But Mr Google cant help me, so I hope someone else can

Wednesday, 9 May 2012

Windsor Weeks

Since I updated here, we've had two sessions at school working on the A - Z wall hanging project.  As usual, the full photos are on the Fun With Fabric blog, but here are the mosaics:

Week 3 (including our first finished square)



and Week 4



No pressure, but I've been told Adult Education is being inspected by OFSTED in two weeks - and to expect a visit - gulp!

Friday, 27 April 2012

Fab Families, and Friday Finishes

The "Fab Families" refer to the family groups that came along to the second session for the Windsor A-Z project: a patchwork wall handing we are making at school to celebrate the Queen's Diamond Jubilee.  The photos can been seen better on the Fun With Fabric blog, but a taster of the work in progress is here



The Finishes - well I actually finished two quilts today!  I'd been working on the binding just 15 minutes at a time after tea, in front of the TV, but here they are, finished:

This was made from charm squares bought (and hand stitched) in the Blue Mountains, New South Wales, bound in a darkish blue, thanks Heather

And this was sitting in the UFO pile for far too long, until both Heather and Jackie suggested a darker orange binding, and I happened to have the perfect colour in my stash.  Thanks ladies!


Friday, 20 April 2012

Why I'm sewing, not being a Domestic Goddess

OK, I'm not sure I could do the Domestic Goddess very well anyway, and of course I'd rather be sewing than pretty much anything else . . . but do look at my kitchen


As if that's not bad enough - look at the photos from the same kitchen in 1988 (yes, 24 years ago)




To be fair, the 1988 kitchen was eventually finished, and then in about 2002 it moved to the room at the back of the house, and now it's moving back into the middle, but sewing is a far more attractive activity!

Anyway sewing has been in abundance - and not just me.  The Fun With Fabric blog has the full info, but here are some mosaics to whet your appetite:

Some Finishes at Broom Farm on Monday
(You'll never guess how Catherine managed a perfect zip on the back of her cushion, the secret is revealed on the Fun With Fabric blog)

 The Windsor A-Z project started on Wednesday

And some Mola Magic at the Museum today (top right is an inspiration, not one of our creations, LOL)